How to Install
For Example – 49ft / 15m Long Large Animatronic Trex Installation
6 tips learn how to complete.
NO.1 – Install dinosaur’s tail on the ground
Tool: Wrench
Notice: 3 or more helpers balance the tail, and tighten screws between inside metal frames.
NO.2 – Loosen legs’ screws on the ground
Tool: Wrench\crane\sling belt
Notice: Left 1 or 2 screws on the metal preventing body slide. Sling body a little and take screws out.
NO.3 – Use crane to lift dinosaur body up
Tool: Crane(5 tons loading)\sling belt
Notice: Place sling belt on the body(above picture display) and take it up gradually preventing slide.
NO.4 – Tighten screws between legs metals
Tool: Wrench\crowbar\crane\sling belt
Notice: While insert bolts between flanges, could release power a little so as to bolts going in.
NO.5 – Glue the legs sponge on the metals
Labor: 2-3 helpers necessary
Notice: The legs sponge with silicone is heavy and big, and need hand-helpers fix them on metals.
NO.6 – Glue the sponge cracks of body & legs
Tool: Glue\brush\water ladle
Notice: Please work installation without rain, otherwise water meets glue causing workless.
Installation Video
Skin Repair Work
6 tips learn how repair skin cracks.
Tools Necessary
Install and repair tools display.